Administration and Contracts
Last updated
Last updated
To participate in Great Works, you must allocate to your Great Work Board. However, these buildings require contracts to work on the project, and there is an administration fee applied to each Great Work attempt. Proper planning is essential to maximize your rewards and avoid unnecessary costs.
Cost per Building: Each Famous Building on your Great Work Board requires a contract to participate. The contract cost between $RRUSH 25 to $RRUSH 5,000 per building.
7-Day Contracts: Contracts are purchased in 7-day increments for each building you place on your board.
Contract Loss: If you merge or burn a building while it has an active contract, the remaining contract time and associated cost are lost. Plan your board and merging strategy carefully to avoid unnecessary losses.
Contract Details:
Base
5
25
Base
4
50
Base
3
135
Base
2
450
Base
1
800
Uncommon
5
40
Uncommon
4
135
Uncommon
3
315
Uncommon
2
500
Uncommon
1
1000
Rare
5
75
Rare
4
200
Rare
3
500
Rare
2
750
Rare
1
1500
Epic
5
135
Epic
4
400
Epic
3
800
Epic
2
1000
Epic
1
2500
Legendary
5
200
Legendary
4
800
Legendary
3
1000
Legendary
2
2000
Legendary
1
3500
Artifact
5
800
Artifact
4
1250
Artifact
3
2000
Artifact
2
3000
Artifact
1
3500
Titan
5
1000
Titan
4
1500
Titan
3
3000
Titan
2
4000
Titan
1
5000
In addition to the contract cost, there is a 15% administration fee applied to the reward of each Great Work attempt. This fee is deducted from the total reward if the project is successful or not.
Example Calculation: For a Level 5 Great Work with a reward of 3,000 RRUSH, the administration fee would be: 15% of 3,000 = 450 RRUSH.
All contracts and administration fees are pooled into the Great Works Reward Pool to sustain the ecosystem and ensure long-term rewards for players.
Example 1: Single Epic Building
Board: 1 Epic 5-Star building.
Attempting: Level 10 Great Work.
Reward: 10,200 RRUSH.
Costs:
Contract: 2,500 RRUSH.
Administration Fee: 1,530 RRUSH (15% of 4,300).
Total Cost: 4,030 RRUSH.
Success Probability: 70%.
Expected Reward: 10,200×0.7=7,140 RRUSH.
Net Expected Reward: 7,140-4,030=3110 RRUSH.
💡 Using more buildings would increase costs and could turn your net reward negative. Plan carefully!
Example 2: Multi-Building Titan Board
Board: 2 Titan 2-Star buildings + 1 Legendary 4-Star building.
Board Grade: Titan (majority grade).
RP Power: 8,000,000.
Attempting: Level 11 Great Work.
Reward: 15,600 RRUSH.
Costs:
Contracts: 1,500 + 1,500 + 1,000 = 4,000
Administration Fee: 2,340 RRUSH (15% of 15,600).
Total Cost: 6,340 RRUSH.
Success Probability: 73%.
Expected Reward: 15,600×0.73=11,388 RRUSH.
Net Expected Reward: 11,388−6,340=7,428 RRUSH.
💡 You might optimize further by reducing the number of buildings to lower contract costs while maintaining success rates.
Optimize Board Composition: Using high-grade buildings with fewer contracts can improve profitability.
Choose the Right Level: Attempting lower levels may result in lower rewards, but the reduced costs and higher probabilities can yield better overall returns.
Calculate Costs vs. Rewards: Always ensure your expected reward exceeds your total costs to avoid losses over time.
Mastering contracts and fees is key to becoming an efficient Great Works strategist!